During Phase 3C, all remaining 1st floor instructional rooms will be renovated as well as existing science labs.
In addition, construction will occur on a new Wellness cardiovascular facility and t...
Phase 3D
Apr 2009 to Aug 2009
The last phase of the renovation will be one of the busiest.
In Phase 3D, student and faculty cafterias, the Library and computer labs, Auditorium and Little Theater, and the Main Gym will all be ...
Phase 3A
Jun 2008 to May 2009
During Phase 3A, a new northwest entryway (shown in schematic above) will be constructed.
The new section of the building - which replaces the old Auto Shop - will house Student Services, a Student...
Lots of "nuts and bolts" changes will happen during Phase 3B.
Follow our video link to take a look at how corridors and stairways are being renovated. More of this renovation will occur during Pha...
Phase Two (COMPLETE)
Oct 2007 to Nov 2008
RB's newly renovated swimming facility opened for the start of the Boys swimming season in 2008.
The new pool is 41 yards long, holds 326,812 gallons of water, and has a moveable bulkhead to accom...
Phase One (COMPLETE)
Apr 2007 to Dec 2007
Pictured above is the school's new Auto Shop, which was relocated across the street to make room for the creation of a new northwest entryway during Phase Three.
During Phase One, one of RB's court...
In preparation for the renovation project, RB's football stadium and athletic track received a much needed upgrade.
Feel free to visit rbbulldogsports.com (see link below) to learn more about our a...
Building Referendum passes
Feb 2006
Thanks to the votes from our amazing community, RB's building bond referendum passed, allowing the renovation to begin.